Answer first: release installation from one room, model and responsibility brief
A project buyer should release office furniture installation only from one dated brief that identifies the exact models and rooms, active BOQ or drawing revision, installation sequence, access window, installer responsibility and handover authority. That keeps a factory quotation, contractor plan and client sign-off route from drifting into different scopes.
Check the loading area, lift and doorway limits, floor protection, working-hour restrictions, temporary storage and room-release order before furniture arrives. Product photos do not prove packed dimensions, carton count, site access or installation scope, so leave those items open for written confirmation against the selected configuration.
- Exact model, quantity and room schedule
- Active BOQ, quotation or drawing revision
- Loading, lift, doorway and working-window limits
- Installer responsibility and factory-guidance questions
- Handover authority and sign-off sequence
Control models, components and hardware during installation
Match every carton or component group to the model, room and quotation revision before assembly begins. Keep workstation screens, pedestals, cabinets, meeting-table parts and hardware packs identified separately so one room is not completed with components intended for another model.
Follow the current assembly instruction or factory guidance for the selected product. Do not use a related model's size, drilling position or hardware assumption when the exact configuration has not been confirmed.
- Model and room label on each component group
- Hardware count before assembly
- Screens, storage and cable parts kept with the module
- Approved finish and orientation check
- Shortage or damage record with photographs
Inspect function, alignment and handover records
Before handover, check desk and table stability, leveling, panel alignment, drawer and door operation, screen fixing, visible finish condition and cable-access components. Record any adjustment, missing item or replacement requirement against the exact model and room reference.
Ask the buyer or project representative to sign one consolidated handover list. Retain final room photographs, approved variations, spare hardware and the closing model schedule so repeat orders can use a verified record instead of reconstructing the installation from memory.
- Stability, leveling and alignment
- Doors, drawers and moving parts
- Screens, storage and cable-access components
- Damage, shortage and corrective-action list
- Signed handover and final room photographs
Prepare one installation-handover brief.
Keep the exact model and room list, active revision, installation sequence, access window and sign-off route on one dated record. The next page carries the brief into BG's RFQ form so you can add company details before sending.
Related verified pages
- View BG-2445W24 workstation ↗
- View BG-2408MT24 conference table ↗
- View BG-2408B storage cabinet ↗
- Control unpacking and hardware-bag trace before assembly ↗
- Turn room-level snags into a model-based closeout list ↗
- Review the export packing checklist ↗
- Build a room and model BOQ ↗
- Review sample approval controls ↗
- Prepare a project furniture RFQ ↗
Turn the guide into a model quotation.
Send model numbers or a room schedule, quantities, destination and timing. BG will confirm the next commercial step.
Prepare an RFQ ↗Frequently asked questions
What should an office furniture installation checklist include?
Include site access, room sequence, exact models, carton and hardware control, assembly references, finish and orientation checks, functional inspection, damage records and signed handover.
How should cartons be organized for a multi-room office project?
Label and group cartons by floor, room, model and quotation revision. Keep supporting screens, storage and hardware with the correct module and verify quantities before assembly starts.
What evidence should be kept after office furniture installation?
Keep the final model schedule, room photographs, signed handover list, approved variations, shortage or damage records and any remaining spare hardware identification.