Answer first: choose the reception desk from the work zones, not the front image alone
A reception desk image can show the visitor-facing shape while hiding the staff worktop, equipment footprint, cable path and storage access behind it. Buyers should define those operating zones on a dated plan tied to the exact model or shortlist before comparing quotations. A decorative front elevation does not by itself confirm usable worktop depth, transaction-ledge position or equipment clearance.
BG Office Furniture is a Foshan manufacturer established in 2015, with a 10,000 m² factory and more than 60 employees, supplying panel-style executive office, manager office, staff office, workstation, meeting table, reception, storage and public-space furniture. BG's current company material statement is an E0 panel standard. Final reception-desk dimensions, configuration, cutouts, accessories, packing, MOQ, price and lead time still require exact-model evidence or BG's written quotation.
- Exact BG model or shortlisted reception-desk family
- Visitor-facing ledge and staff worktop shown as separate zones
- Monitor, keyboard, telephone, printer, scanner and document-handling areas marked from actual equipment inputs
- Cable entry, power and data points separated into furniture-side and site-side responsibilities
- Unknown sizes or accessories left open for written confirmation rather than inferred from an image
Map the visitor exchange and staff work zones before fixing the counter layout
Start with the lobby plan and the job the counter must support: greeting, visitor registration, document exchange, parcel handoff, payment equipment or controlled access. Mark where each activity happens and whether the buyer needs one continuous visitor ledge or several distinct counter zones. Keep any accessibility, security or local-code requirement as a buyer or consultant input; this guide does not prescribe a universal height or clearance.
On the staff side, show the seated or standing work position, screen direction, leg space, drawer and door openings, shared equipment and the route between entry, waiting area and back office. This reveals conflicts that a front view cannot show, such as a printer blocking knees, a cable route crossing a drawer, or a transaction point facing away from the queue.
- Named reception tasks and the visitor-facing zone used for each
- Staff positions, screen direction and document handoff path
- Door, drawer, cabinet and equipment access zones
- Lobby approach, queue direction and adjacent waiting-area relationship
- Buyer or consultant requirements recorded separately from model facts
Build an equipment and cable schedule instead of asking for a generic cutout
List each device with its actual footprint, cable direction and operator position. Then identify whether it sits on the worktop, below the counter, in a cabinet or on a separate site-supplied support. If a screen arm, printer shelf, cash drawer, access-control device or other specialist item is required, label it as buyer-supplied, site-supplied, optional or requested for BG confirmation.
Mark floor boxes, wall outlets and site electrical work on the room plan, then ask which grommets, access openings, cable trays or removable panels are included in the selected furniture scope. A requested cutout should be controlled by a dimensioned equipment reference and an approved drawing revision, not by a verbal note or a cropped photograph.
- Device name, quantity, footprint, cable side and operator position
- Worktop, under-counter, cabinet or separate-support location
- Furniture-side cable parts separated from site electrical work
- Cutout size and position held pending approved equipment data and drawing
- Loose accessories and specialist devices listed by supply responsibility
What to send in a reception-desk RFQ
Send one dated file containing the exact model or shortlist, lobby plan, visitor approach, staff positions, required transaction zones, verified equipment list, power and data inputs, storage needs, finish reference, destination and open questions. Add the BG-24812 or BG-24809 pages when either model is relevant, but do not treat their images as confirmation of every internal detail.
Use the same control file for quotation comparison, shop-drawing comments, sample review, production release and site handover. Any changed equipment, cutout, branding, finish or room condition should receive a dated revision. Final dimensions, configuration, included parts, compliance, MOQ, packing, price and lead time remain subject to BG's written confirmation for the exact model and revision.
- Model, quantity, destination and lobby or branch code
- Dimensioned room plan with visitor approach and staff-side orientation
- Transaction zones, equipment schedule, storage and cable requirements
- Finish, branding or service-cutout references with revision status
- One list of open items that BG must confirm before approval
Related verified pages
- Browse verified reception-desk model pages ↗
- View BG-24812 as a reception-counter model reference ↗
- View BG-24809 as a project reception-desk reference ↗
- Control branding and service-cutout revisions ↗
- Map visitor approach and queue flow ↗
- Separate furniture cable scope from site electrical work ↗
- Prepare a model-based reception-desk RFQ ↗
Turn the guide into a model quotation.
Send model numbers or a room schedule, quantities, destination and timing. BG will confirm the next commercial step.
Prepare an RFQ ↗Frequently asked questions
Can a buyer confirm reception-counter dimensions from a product image?
No. Use the image only as a visual reference. Final external dimensions, worktop depth, ledge position and internal clearances require exact-model evidence, a verified drawing or BG's written quotation.
What equipment should be listed before requesting a reception desk quotation?
List the monitors, keyboards, telephones, printers, scanners, payment or access devices and document-handling equipment that affect worktop, storage, cutout or cable planning, with actual footprints when available.
Does BG supply power outlets and electrical installation with every reception desk?
Not automatically. Separate furniture-side grommets, openings, trays or removable panels from floor boxes, outlets, devices and site electrical work, then ask BG to confirm the exact quoted scope.
Does this guide set a universal accessible counter height?
No. Accessibility and local-code requirements must come from the buyer, architect or responsible consultant for the project location. BG can review the requested dimensions against the selected model and issue written confirmation where applicable.
