Office Furniture Shop Drawing and Approval Revision Guide for B2B Orders

Control office furniture shop drawings, revision comments and production-release approvals by exact model, size, finish, BOQ line and room schedule before an export order starts.

Published 2026-08-03 · Reviewed by BG Office Furniture export team

Open the drawing review from the exact model trail, BOQ line and approval question

A shop drawing helps only when the buyer and factory are already working on the same order basis. Start from the exact BG model, selected size, finish reference, included accessories, quantity, room or BOQ line and the specific approval question that still blocks the order. A forwarded image or general layout mark-up without that commercial trail creates avoidable revision loops.

For office projects, connect the drawing request to the same room schedule, workstation zone, meeting-table layout, reception counter or storage line that will later control quotation revision, sample approval, packing notes and site handover. The goal is not to collect more drawings. The goal is to make one drawing review usable for the next commercial step.

  • Exact model number and product family already under review
  • Selected size, handed orientation or seat-count basis where relevant
  • Finish, sample or material reference kept on the same revision trail
  • Included storage, cable parts, screens, modesty panels or accessories repeated line by line
  • Room, floor, BOQ or zone reference for the current order basis
  • Destination, target timing and the approval point still awaiting written confirmation

Review the drawing as a control document, not only as a picture

The drawing should confirm what production is allowed to make, not just what the product generally looks like. Check the footprint, return orientation, storage position, user side, cable access, grommet or flip-box location, panel layout, opening direction and any visible hardware note that changes what will actually be packed or installed.

If the public catalogue does not publish every accessory dimension or cut-out detail, keep those fields open until the factory provides the current drawing or written confirmation. Do not fill the gap by estimating from a perspective image or by copying dimensions from another BG family member. Unknown remains unknown until the live order record closes it.

  • Overall length, depth and height against the active room or BOQ basis
  • Return, side cabinet, screen or credenza orientation
  • Cabinet, drawer, leg, modesty-panel and clearance positions
  • Cable-access, power-box, grommet or cut-out location where relevant
  • Visible finish, edge, panel-material or exposed-surface notes
  • Any open measurements, accessory counts or coordination points still awaiting written confirmation

Use one revision-control matrix before quotation, sample and production drift apart

Each comment round should carry a revision number and date, but that alone is not enough. Buyers need one simple revision-control matrix that repeats the document name, current revision, affected models or rooms, open comments, owner and next action. When size, finish, component layout or room allocation changes, move that same change onto the active quotation, drawing, BOQ note and sample-approval trail instead of letting one file run ahead of the others.

Before deposit release or production start, confirm which revision is approved for manufacturing and which earlier files are superseded. Keep the written approval together with the model list, final drawing, finish reference and any packing or installation note so repeat orders, receiving teams and handover reviews can trace the same live version.

  • Matrix row 1: quotation or PO revision, affected models and current commercial scope
  • Matrix row 2: shop drawing revision, affected room or BOQ lines and open geometry comments
  • Matrix row 3: sample, finish or hardware approval reference tied to the same models
  • Matrix row 4: buyer-side owner, factory-side owner and the next written action
  • Matrix row 5: production-release status showing one final approved revision for manufacturing

Run a final checklist before approving the last revision

The safest time to catch a drawing problem is before the last approval moves into production, packing or site preparation. Run a short final checklist that compares the live drawing revision with the active quotation, room schedule and any finish or hardware approval. This is especially important for executive offices, workstation clusters, meeting tables, reception counters and storage runs where one revision can affect several linked items at once.

If a field is still open, keep it visibly open and ask BG to confirm it in writing. Do not convert an unfinished drawing comment into an assumed commercial promise about lead time, MOQ, packing, installation responsibility or claim outcome.

  • The drawing revision date matches the active quotation or PO revision
  • Exact models, sizes, handed layouts and included components still match the BOQ or RFQ trail
  • Finish, sample, cable-access and hardware notes match the latest written approval
  • Any room, floor, carton or installation-sequence impact is repeated before release
  • Unresolved fields stay pending for written confirmation instead of being guessed from older files

Related verified pages

Turn the guide into a model quotation.

Send model numbers or a room schedule, quantities, destination and timing. BG will confirm the next commercial step.

Prepare an RFQ ↗

Frequently asked questions

What should a buyer send before asking BG to revise or approve a shop drawing?

Send the exact models, selected sizes, room or BOQ references, finish basis, included accessories, the current quotation or PO revision, and the specific drawing comments or open decisions that still need written confirmation.

Can a drawing approval replace the quotation, BOQ or sample record?

No. The drawing is one approval document inside the wider order trail. Buyers should keep it aligned with the quotation, BOQ, sample or finish approval, and any hardware or packing notes that affect the same models.

What should be stored after the final drawing is approved?

Keep the final approved revision number, dated revision-control matrix, matching quotation or PO revision, model list, selected sizes, finish reference, closed comments, and any related sample, hardware, BOQ, packing or installation notes together.